Project Update

As usual, we are working diligently and methodically on various projects. I don’t give updates every week because the schedule is so fluid, so changing, that it’s hard to pin down. This is natural. All sorts of things can delay (or set ahead!) a project. But I probably should do updates more often. Clients seem to like it.

The following projects are finished, awaiting documentation (digital photography), or will be done very soon (2-5 days):
Big Daddy 02 CL
Tyranids 01 BH B
Gritty Orks 02 BC
Tau 10 TO
Space Marines 01 JR red/yellow
Decapitator 01 JD
Alien Terrain FLDLV
Wyches of Thoth 02 BV
AI 02 MN bombers
Crimson Fists 01 RB
Blood Bowl Dark Elves 01 AA
Khador 03 MW
Tyranids 01 ED by nov 22
The following are under the brush (or soon will be) and have an expected completion time of 5-10 days:
Old West Buildings 01 CC
Gritty Orks 03 BC
Heroes 01 ML
Black Templars 01 RH
Mortifactors 01 ST
Imperial Guard 01 JF
Iyanden 03 BH
Salamanders 01 DD
BFG 01 PM
Cygnar 01 RC
Eldar 01 DD
Assassin 01 AK
Alien Terrain
War Machine 13 BF
Deathwing 03 CG er
Khorne 04 JB
The following projects are in Assembly or are just exiting Assembly:
Dark Elves 01 TB
War Machine 14 JL
Heroes 01 ML
Black Templars 01 RH
War Machine 12 JL
Salamanders 01 DD
Cygnar 01 GV
Tau 03 SL
Imperial Fleet 02 EB
The following projects are in a holding pattern– waiting for materials, instructions or something else:
AI 02 MN
Chaos 04 JC Deathguard 02 HT
Tomb Kings 01 RY
Tzeentch Lord 02 AC
Warmaster 02 GQ
Dark Elves 01 RC
Assassin 01 AK
Sisters of Battle 02 CS
Khorne Daemon Princes 01 MS
Wood Elves 01 JL
Ultramarines 02 SA
Vampire Counts 04 LG
Ultramarines 02 DS
The following projects are coming up in the next few weeks:
Warmaster 02 GQ
Wood Elves 01 JL bf
Tzeentch Lord 02 AC
Tau 03 SL
Ultramarines 02 MN
Deathguard 02 HT
Dark Elves 01 RC
Dark Elves 01 TB
Imperial Fleet 02 EB
Cygnar 01 GV
Sisters of Battle 02 CS
Tomb Kings 01 RY bf and er
Chaos 04 JC termies
Khorne Daemon Princes 01 MS

See how time-consuming that is? And in 48 hours it will all be switched around as packages go flying in and out. We are careful, we keep good track of everything.

Now, if you didn’t see your project, or you have ANY questions at all, I am completely at your disposal.

Posted on November 27th, 2008 at 7:45pm by Shawn


Categories: Uncategorized

Comments: No comments



 

Leave a Reply

Blue Captcha Image
Refresh

*